0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 23 September 1868
Completion: 15 June 1876
Status: in use

Project Type

Structure: Swing bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , , ,
Crosses:
  • Tyne River
Coordinates: 54° 58' 2.68" N    1° 36' 27.39" W
Show coordinates on a map

Technical Information

Dimensions

width 14.48 m
total length 170.8 m
clearance 4.42 m
swing span length 85.7 m
weight 1 500 t

Cost

cost of construction Pound sterling 288 000

Chronology

23 September 1868

Beginning of works.

15 June 1876

Opening.

Participants

Design
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Manders, Frank / Potts, Richard: Crossing the Tyne. Tyne Bridge Publishing, Newcastle upon Tyne (United Kingdom), pp. 128.
  • About this
    data sheet
  • Structure-ID
    20010201
  • Published on:
    04/09/2003
  • Last updated on:
    07/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine