General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Rigid frame bridge |
Location
Location: |
Toro, Zamora, Castile-Leon, Spain |
---|---|
Crosses: |
|
Coordinates: | 41° 30' 28.70" N 5° 23' 54.70" W |
Technical Information
Dimensions
total length | 155.40 m | |
span lengths | 38.00 m - 78.00 m - 38.00 m | |
number of spans | 3 | |
roadway / carriageway width | 8.00 m | |
deck | deck depth | 1.80 - 4.00 m |
deck width | 11.30 m |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Experiencias en puentes construidos por el sistema de avance en voladizo sucesivo. In: Hormigón y acero, v. 42, n. 180 (3rd Quarter 1991), pp. 109-118. (1991):
- About this
data sheet - Structure-ID
20076334 - Published on:
06/11/2018 - Last updated on:
06/11/2018