0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2023
Completion: 1 July 2027
Status: under construction

Project Type

Location

Location: , ,
Next to: Sotra Bridge (1971)
Coordinates: 60° 22' 7.09" N    5° 10' 6.30" E
Show coordinates on a map

Technical Information

Dimensions

main span 608 m
total length 902 m
vertical navigation clearance 50 m
pylons height 145 m
number 2

Materials

deck steel
pylons reinforced concrete

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20086716
  • Published on:
    30/08/2023
  • Last updated on:
    02/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine