General Information
Other name(s): | Hatirjheel Fourth Bridge |
---|---|
Official designation: | BR-04 |
Beginning of works: | 5 April 2010 |
Completion: | 30 November 2012 |
Status: | in use |
Project Type
Structure: |
Through rigid-frame bridge with inclined legs |
---|---|
Material: |
Reinforced concrete bridge |
Function / usage: |
Road bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Dhaka, Dhaka, Dhaka, Bangladesh |
---|---|
Coordinates: | 23° 46' 7.12" N 90° 25' 20.83" E |
Technical Information
Dimensions
total length | 90.000 m | |
span lengths | 3 x 30.000 m | |
deck width | 12.50 m | |
number of spans | 3 | |
number of lanes | 2 x 1 | |
roadway / carriageway width | 7.10 m | |
walkway width | 2 x 1.75 m |
Materials
piers |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
portal legs |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Concrete highway arch bridges in Bangladesh: Historical development and lessons learnt. Presented at: IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. (2015):
- External post-tensioning of pier heads and bearing replacement of Hatirjheel bridge #4. Presented at: IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. (2015):
- About this
data sheet - Structure-ID
20072369 - Published on:
05/01/2017 - Last updated on:
07/03/2017