0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Nuovo ponte ferroviario sul Po tra Borgo Mantovano e Ostiglia
Beginning of works: 2003
Completion: 28 August 2008
Status: in use

Project Type

Function / usage: Railroad (railway) bridge
Material: main bridge:
Steel bridge
Structure: main bridge:
Through truss bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaducts:
Girder bridge

Location

Location: , , ,
, , ,
Crosses:
  • Po River
Coordinates: 45° 4' 1.82" N    11° 8' 37.30" E
Coordinates: 45° 2' 41.37" N    11° 7' 57.64" E
Show coordinates on a map

Technical Information

Dimensions

length 2 650 m
main bridge
length 931.40 m
number of spans 12

Quantities

structural steel 12 652 t

Cost

cost of construction 28 000 000 €

Materials

piers reinforced concrete
truss steel

Chronology

14 December 2008 First track open for train service
26 July 2009 Second track open for train service

Notes

Longest italian railroad truss bridge

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080724
  • Published on:
    09/03/2021
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine