0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Neuer Mainzer Tunnel
Beginning of works: 1997
Completion: 2000
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , ,
Next to: Mainz Central Station (1884)
Coordinates: 49° 59' 37.73" N    8° 16' 32.03" E
Coordinates: 49° 59' 52.96" N    8° 15' 40.46" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 304 m
tunnel section area 139 m²

Materials

tunnel structure reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003966
  • Published on:
    24/06/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine