0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

New Croton Dam Spillway Bridge

General Information

Completion: 1975
Status: in use

Project Type

Function / usage: Road bridge
Structure: Deck arch bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Material: Steel bridge

Location

Location: , , ,
Replaces: New Croton Dam Spillway Bridge (1905)
Replaced by: New Croton Dam Spillway Bridge (2004)
Connects to: New Croton Dam (1907)
Coordinates: 41° 13' 39.63" N    73° 51' 25.48" W
Show coordinates on a map

Technical Information

Dimensions

total length 60.96 m
number of spans 1

Materials

deck steel
arches steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20087468
  • Published on:
    10/11/2023
  • Last updated on:
    11/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine