General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Neuhof, Fulda (Kreis), Hesse, Germany |
---|---|
For: |
A 66 Motorway (Germany)
|
Coordinates: | 50° 27' 26.03" N 9° 37' 23.93" E |
Coordinates: | 50° 26' 40.13" N 9° 36' 40.05" E |
Technical Information
Dimensions
total length | 1 610 m | |
clear interior profile | 9.50 m x 4.80 m | |
micropiles | number | 2 566 |
Quantities
concrete volume | 111 000 m³ | |
reinforcing steel | 15 600 t | |
volume of extracted material | 672 000 m³ | |
sheet piling | 13 300 m² | |
submerged concrete volume | 17 700 m³ | |
volume of earthworks | 301 000 m³ |
Cost
cost of construction | Euro 69 500 000 |
Participants
Owner
Owner's representative
Client
Design
Structural engineering
Checking engineering
- Peter Strauß (checking engineer)
Co-contractor
Construction management
Site supervision
Tunnel equipment
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2015. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2015, pp. 121-136.
- About this
data sheet - Structure-ID
20070624 - Published on:
02/02/2016 - Last updated on:
02/02/2016