0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: March 2008
Completion: September 2014
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
For: A 66 Motorway (Germany)
Coordinates: 50° 27' 26.03" N    9° 37' 23.93" E
Coordinates: 50° 26' 40.13" N    9° 36' 40.05" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 610 m
clear interior profile 9.50 m x 4.80 m
micropiles number 2 566

Quantities

concrete volume 111 000 m³
reinforcing steel 15 600 t
volume of extracted material 672 000 m³
sheet piling 13 300 m²
submerged concrete volume 17 700 m³
volume of earthworks 301 000 m³

Cost

cost of construction Euro 69 500 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070624
  • Published on:
    02/02/2016
  • Last updated on:
    02/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine