0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Elsterbrücke Neudeck
Beginning of works: 1904
Completion: 1905
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
Address: L 673
Crosses:
  • Schwarze Elster
Coordinates: 51° 38' 9.40" N    13° 16' 36.92" E
Show coordinates on a map

Technical Information

Dimensions

width 5.71 m
total length 70.45 m
span lengths 16.35 m - 24.15 m - 16.35 m
number of spans 3
bridge surface 407 m²

Quantities

Rehabilitation
concrete volume 345 m³
reinforcing steel 87 t

Cost

Rehabilitation
cost of construction Euro 1 400 000

Materials

piers concrete
arches tamped concrete
abutments concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2020): Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 9./10. März 2020, Dresden (Germany), pp. 235.
  • About this
    data sheet
  • Structure-ID
    20079354
  • Published on:
    06/05/2020
  • Last updated on:
    06/05/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine