General Information
Completion: | 1989 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with harp system Two-span cable-stayed bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) Pipeline bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 118.5 m | |
span lengths | 118.5 m - 51 m - 34.5 m | |
deck width | 6.5 m | |
number of spans | 3 | |
on-center distance between girders | 3.0 m | |
girder depth | 2.5 m | |
pylon | height | 47.14 m |
Design Loads
live load | 400 kg/m |
Materials
pylon |
reinforced concrete
|
---|---|
main girders |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Stabilization of a cable-stayed footbridge. Presented at: IABSE Symposium: Extending the Lifespan of Structures, San Francisco, CA, USA, August 1995, pp. 1099-1104. (1995):
- About this
data sheet - Structure-ID
20004418 - Published on:
26/07/2002 - Last updated on:
05/02/2016