General Information
Other name(s): | Tsubasa Bridge; Neak Leung Bridge |
---|---|
Beginning of works: | 12 February 2011 |
Completion: | 6 April 2015 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Three-span cable-stayed bridge Cable-stayed bridge with semi-fan system |
Material: |
Prestressed concrete bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Kandal, Cambodia Neak Leung, Prey Veng, Cambodia |
---|---|
Crosses: |
|
Coordinates: | 11° 16' 33.51" N 105° 16' 44.32" E |
Technical Information
Dimensions
width | 16.98 m | |
total length | ca. 2 200 m | |
pylons | height | 121.0 m |
main bridge | ||
---|---|---|
main span | 340 m | |
total length | 640 m |
Materials
deck |
prestressed concrete
|
---|---|
pylons |
reinforced concrete
|
Case Studies and Applied Products
The Tsubasa Bridge – Cambodia’s longest bridge
With a length of approx. 167 km, National Highway 1 in Cambodia connects the capital of Phnom Penh with the Bavet border crossing to Vietnam. Due to the increasing congestion on this important route, a decision was made to construct the ... [more]