0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Narellan Road Footbridge

Structurae currently has catalogued 1 relevant publication(s) listed below.

  1. Tomczyk, Przemo / Gamble, Syd (2022): Cable-Stayed Footbridge Deck Constructed Without Tensioning of Cables – Design vs. On-Site Reality. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.

    https://doi.org/10.24904/footbridge2022.258