General Information
Other name(s): | Ling-Tie Bridge |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
span lengths | 40 m - 50 m - 55 m - 300 m - 2 x 55 m - 50 m - 40 m - 30 m | |
number of spans | 9 | |
arch | arch span | 300 m |
Quantities
concrete volume | 13 000 m³ | |
arches | structural steel | 4 800 t |
deck | structural steel | 5 000 t |
Materials
arches |
steel
|
---|---|
deck of approach viaducts |
prestressed concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Nanning Butterfly Tied Arch Bridge Over the Yong River in China. In: Structural Engineering International, v. 20, n. 3 (August 2010), pp. 308-311. (2010):
- Taking flight. A new bridge with unsymmetrical arches and a curved deck has just opened in Guangxi in China. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009), pp. 60-61. (2009):
- About this
data sheet - Structure-ID
20004897 - Published on:
08/09/2002 - Last updated on:
26/04/2023