General Information
Other name(s): | Hadong-Namhae Bridge |
---|---|
Beginning of works: | May 1968 |
Completion: | 22 June 1973 |
Status: | in use |
Project Type
Structure: |
Three-span suspension bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Namhae County, South Gyeongsang, South Korea Hadong County, South Gyeongsang, South Korea |
---|---|
Next to: |
Noryang Bridge (2018)
|
Coordinates: | 34° 56' 40.53" N 127° 52' 19.73" E |
Technical Information
Dimensions
main span | 404 m | |
width | 11 m | |
length of side spans | 125 m | |
total length | 660 m | |
deck | deck width | 12.00 m |
roadway / carriageway width | 7.200 m | |
pylons | total height | ca. 60 m |
pylon height (above deck) | 38 m |
Materials
pylon |
steel
|
---|---|
deck |
steel
|
Excerpt from Wikipedia
The Namhae Bridge is a suspension bridge that connects Hadong Noryang and Namhae Noryang, South Korea. The bridge, completed in 1973 has a total length of 660 meters. The bridge has a real-time monitoring system installed to monitor its performance.
Text imported from Wikipedia article "Namhae Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Initial construction (1968-1973)
Construction
Main contractor
Monitoring (1996)
Contractor
Monitoring equipment
Relevant Web Sites
Relevant Publications
- (2016): Partially Strengthened Main Cable System for the Rehabilitation of an Old Suspension Bridge. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 1530-1535.
- About this
data sheet - Structure-ID
20008116 - Published on:
11/02/2003 - Last updated on:
07/05/2024