General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Yangyang County, Gangwon, South Korea |
---|
Technical Information
Dimensions
total length | 470 m | |
span lengths | 40 m - 70 m - 80 m - 90 m - 80 m - 70 m - 40 m | |
number of spans | 7 | |
deck | deck width | 20.020 m |
Quantities
prestressing steel | 322 t |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
prestressed concrete
|
Participants
Owner
Design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010748 - Published on:
28/11/2003 - Last updated on:
21/04/2016