General Information
Completion: | 2007 |
---|---|
Status: | in use |
Project Type
Structure: |
Tied-arch bridge with inclined hangers |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
main span | 60 m | |
deck width | 5.0 m | |
ramp 1 | total length | 43.40 m |
span lengths | 10.00 m - 15.00 m - 9.058 m - 9.34 m | |
number of spans | 4 | |
ramp 2 | total length | 56.795 m |
span lengths | 7.148 m - 7.181 m - 2 x 16.233 m - 10.00 m | |
number of spans | 5 |
Materials
arches |
steel tubes
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel tubes
|
tension ties |
steel tubes
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bowstring Footbridges in the Cycling Ring Road in Madrid. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 133-134. (2008):
- About this
data sheet - Structure-ID
20072400 - Published on:
09/01/2017 - Last updated on:
28/06/2018