General Information
Other name(s): | Oka River Bridge; Myza Bridge |
---|---|
Beginning of works: | 1972 |
Completion: | 1 August 1981 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Precast segmental construction |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nizhny Novgorod, Nizhny Novgorod Oblast, Volga Federal District, Russia |
---|---|
Crosses: |
|
Coordinates: | 56° 15' 3" N 43° 56' 46" E |
Technical Information
Dimensions
total length | 988 m | |
span lengths | 2 x 85 m - 5 x 126 m - 2 x 84 m | |
number of spans | 4 | |
deck | deck depth | 3.628 m |
deck width | 27 m |
Materials
superstructure |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering Handbook. CRC Press, Boca Raton (USA), pp. 66-16. (1999):
- About this
data sheet - Structure-ID
20001486 - Published on:
13/06/2001 - Last updated on:
01/09/2020