General Information
Completion: | 30 December 2004 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Vietnam |
---|
Technical Information
Dimensions
main spans (3x) | 90 m | |
span lengths | 60 m - 3 x 90 m - 60 m | |
number of spans | 5 |
Materials
deck |
prestressed concrete
|
---|
Participants
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Striking a balance. In: Bridge Design & Engineering, v. 11, n. 38 (1st Quarter 2005), pp. 50.
- About this
data sheet - Structure-ID
20015447 - Published on:
07/03/2005 - Last updated on:
30/01/2018