0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1974
Completion: 1976
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: ,
Crosses:
  • Euphrates River
Coordinates: 32° 47' 32.43" N    44° 17' 19.08" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 9 x 36.00 m
number of spans 9

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007042
  • Published on:
    02/12/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine