General Information
Completion: | 1973 |
---|---|
Status: | partially collapsed |
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Pipeline bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 59.3 m | |
total length | 546.55 m | |
number of spans | 7 | |
piers | number | 8 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
pipes |
steel
|
Chronology
3 October 2021 | The fourth span from the left bank, the center span, collapses suddenly. The collapse disrupts the supply of fresh water to around 60.000 households or 40% of the city of Wakayama. The next day, the households begin to be supplied with emergency water through water tankers and other means. Later investigations show that four of the suspenders between the arches and the pipes of that span had correded and broken as early as December 2020. |
---|---|
6 October 2021
— 9 October 2021 |
A bypass for the water pipeline is built on Rokujutani Bridge, a road bridge which is closed to traffic for this purpose. |
2022 | The collapsed span and the adjacent ones are replaced to repair the water pipeline. The bypass is removed and Rokujutani Bridge reopened to road traffic by 10 June 2022. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20090397 - Published on:
28/01/2025 - Last updated on:
28/01/2025