0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 15 August 2022
Completion: 1 November 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Sebeya river.
Coordinates: 1° 42' 0" S    29° 16' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 42 m

Materials

cables steel wire
deck steel
pylons steel

Notes

The bridge built by Bridges to Prosperity serves around 1900 people in the communities of Rwaza/gateko-rwaza/mushoko.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088219
  • Published on:
    11/04/2024
  • Last updated on:
    11/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine