0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 23 January 1881
Status: demolished (2007)

Project Type

Structure: Greiner truss bridge
Function / usage: Railroad (railway) bridge
Material: Iron bridge

Location

Location: , ,
Crossed:
  • Murrumbidgee River
Coordinates: 35° 6' 56.50" S    147° 22' 57.94" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 4 x 48.5 m
number of spans 4

Materials

truss wrought iron

Chronology

16 December 1880

Load testing.

23 January 1881

The bridge is opened to traffic.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049400
  • Published on:
    04/12/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine