General Information
Name in local language: | Nahebrücke Münster-Sarmsheim |
---|---|
Beginning of works: | 1956 |
Completion: | 1958 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bingen am Rhein, Mainz-Bingen, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Coordinates: | 49° 56' 39.91" N 7° 53' 53.56" E |
Technical Information
Dimensions
main span | 62.5 m | |
total length | 368 m | |
number of spans | 7 | |
superstructure | deck depth | 2.75 m |
deck width | 17.5 m |
Cost
cost of construction | German Mark 3 774 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Architecture
- Wilhelm Tiedje (architect)
- Gerd Lohmer (architect)
Structural engineering
- Wayss & Freytag
- Hermann Bay (structural engineer)
Checking engineering
- Hirschfeld (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hochstraßen. Planung - Ausführung - Beispiele. 2nd edition, Beton-Verlag GmbH, Düsseldorf (Germany), pp. 68+. (1967):
- About this
data sheet - Structure-ID
20006205 - Published on:
14/10/2002 - Last updated on:
26/02/2019