General Information
Completion: | 17 June 2006 |
---|---|
Status: | in use |
Project Type
Structure: |
Multiple-span cable-stayed bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Jönköping, Jönköpings län, Sweden |
---|---|
Coordinates: | 57° 46' 43" N 14° 10' 8" E |
Technical Information
Dimensions
total length | 262.5 m | |
span lengths | 6 x 43.75 m | |
number of spans | 6 | |
deck | number of lanes | 2 x 2 |
total width | 14.75 m | |
pylons | number | 2 x 5 |
Cost
cost of construction | Swedish crowns 107 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
pylons |
steel
|
stay cables |
steel
|
Chronology
17 June 2006 | Opening. |
---|
Notes
The bridge is a multi-span cable stayed bridge across lake Munksjön with a total length of 262.5 m divided into six spans of 43.75 m. The superstructure is composite and the pylons are made of steel. The central pylons are stabilized by a horizontal top stay. The stays are fabricated from high strength solid steel bars joined by couplers into the required length. The bridge currently carries two traffic lanes, two lanes for bicycles and two walkways, but the bridge is prepared for future widening to four traffic lanes. The bridge was installed by launching from one end.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20019393 - Published on:
07/02/2006 - Last updated on:
05/02/2016