0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 11 July 2022
Completion: 28 October 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Muyanza River river.
Coordinates: 1° 43' 0" S    30° 4' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 52 m

Materials

cables steel wire
deck steel
pylons steel

Notes

The bridge built by Bridges to Prosperity serves around 800 people in the communities of Muduha-Gatenderi.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088201
  • Published on:
    11/04/2024
  • Last updated on:
    11/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine