0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1932
Completion: 1933
Status: demolished (1987)

Project Type

Structure: Pony truss bridge
Function / usage: Road bridge

Location

Location: , ,
Coordinates: 36° 39' 48.24" N    114° 34' 16.93" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20050742
  • Published on:
    21/12/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine