General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Rigid frame bridge |
Material: |
Reinforced concrete bridge |
Support conditions: |
for registered users for registered users |
Construction method: |
In-situ casting on falsework |
Location
Location: |
Wendelstein, Roth (Kreis), Bavaria, Germany |
---|---|
Address: | A 73 / St 2239 |
Carries: |
A 73 Motorway (Germany)
|
Coordinates: | 49° 22' 8.11" N 11° 10' 13.35" E |
Technical Information
Dimensions
width | 44.83 m | |
total length | 21.85 m | |
span | 21.85 m | |
bridge surface | 828 m² | |
deck | deck depth | 0.90 - 1.20 m |
Quantities
concrete volume | 3 800 m³ | |
reinforcing steel | 644 t |
Cost
cost of construction | ca. Euro 6 300 000 |
Materials
superstructure |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
foundation slabs |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 31. Dresdner Brückenbausymposium, 7./8. Juni 2022, Dresden (Germany), pp. 202. (2022):
- About this
data sheet - Structure-ID
20083085 - Published on:
08/06/2022 - Last updated on:
08/06/2022