General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Carlisle, Cumbria, North West England, England, United Kingdom |
---|
Technical Information
Dimensions
total length | 863.3 m | |
standard span lengths | 34 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Demolition
Client
Consulting engineers
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Abbruch des Mossband Viaduct, Carlisle. In: DSI Info, n. 17 ( 2009- 2010), pp. 42-43.
- Railway Bridge Construction. Some Recent Developments. Hutchinson Eductational Ltd, London (United Kingdom), pp. 14-19. (1972):
- (2010): Using Acoustic Monitoring to Extend the Life of Post-Tensioned Cable Supported Bridges. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 138-139.
- About this
data sheet - Structure-ID
20023398 - Published on:
06/10/2006 - Last updated on:
05/02/2016