General Information
Completion: | 2005 |
---|---|
Duration of works: | 1.5 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
U-shaped girder bridge |
Material: |
Reinforced concrete bridge |
Location
Technical Information
Dimensions
width | 4 m | |
span | 11 m | |
clearance | 0.5 - 3 m |
Cost
cost of construction | Euro 9 000 |
Materials
deck |
reinforced concrete
|
---|
Participants
Design
Construction
Sponsors
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20019033 - Published on:
12/01/2006 - Last updated on:
05/02/2016