0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Housatonic River Bridge
Beginning of works: 2011
Completion: 2016
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Housatonic River
Carries:
  • Interstate I-95
Part of:
To replace: Moses Wheeler Bridge (1958)
Coordinates: 41° 12' 17.75" N    73° 6' 34.42" W
Show coordinates on a map

Technical Information

Dimensions

width 36.58 m
total length 973 m

Cost

cost of construction United States dollar 116 500 000

Materials

piers reinforced concrete
abutments reinforced concrete
girders steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20016197
  • Published on:
    25/04/2005
  • Last updated on:
    06/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine