General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Winningen, Rhein-Mosel, Mayen-Koblenz, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 50° 18' 53.93" N 7° 29' 39.88" E |
Technical Information
Dimensions
height | 136 m | |
length | 935 m | |
span lengths | 156.8 m - 218.2 m - 170.5 m - 146.1 m - 133.9 m - 109.6 m | |
number of spans | 6 | |
height above valley floor or water | 136 m | |
abutments | number | 2 |
deck | deck depth | 6.00 - 8.50 m |
deck width | 30.5 m | |
piers | number | 5 |
Cost
cost of construction | German Mark 40 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
girder |
steel
|
abutments |
reinforced concrete
|
Excerpt from Wikipedia
The Moselle Viaduct (German: Moseltalbrücke) carries the Bundesautobahn 61 over a meander of the river Moselle, connecting the Hunsrück and Eifel mountain ranges. It was built between 1969 and 1972 between the German villages Winningen and Dieblich, about 10 kilometres (6.2 mi) southwest of Koblenz, where the river Moselle flows into the river Rhine.
Moselle Viaduct is also the name of the 1974 bridge where Bundesautobahn 1 between Wittlich and Trier crosses the river Moselle near Schweich.
History and construction
The Federal Ministry of Transport, Building and Urban Development ordered the construction of the Moselle Viaduct with the state road division of Rhineland-Palatinate and the road department of Andernach. The construction was conducted by Heinz Schnorpfeil Bau GmbH, DSD Dillinger Stahlbau, Ed. Züblin AG, Julius Berger Bauboag AG, and Lenz-Bau AG. The total construction costs were 39 million DM.
Like many bridges in the area, it was built as a steel beam bridge. The road deck is 935 metres (3,068 ft) long, 30.5 metres (100 ft) wide and weighs 11,463 tonnes (11,282 long tons; 12,636 short tons). It rests 136 metres (446 ft) above the valley's lowest point on hollow concrete piers with walls of 30 centimetres (12 in) thick, which span respectively 156.8 – 218.2 – 170.5 – 146.1 – 133.9 – 109.6 m (514 – 716 – 559 – 479 – 439 – 360 ft). At the time, it was world's tallest motorway bridge.
Inside the steel deck is a cavity which can be filled with explosives to blow up the entire bridge in case of a war.
The construction works suffered one casualty when on 1 July 1971 an engineer fell off the Blumslay cliff. This later gave rise to the urban legend that he had slipped into one of the hollow piers, and because his body could not be recovered his remains were left at the bottom of the pier.
At the north side of the bridge is a rest area on both sides of the road with an observation site overlooking the Moselle valley and the bridge. One can walk underneath the road deck to the rest area on the opposite side.
Text imported from Wikipedia article "Moselle Viaduct" and modified on December 7, 2023 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Brücken / Bridges. Ästhetik und Gestaltung / Aesthetics and Design. 4th edition, Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 186-187. (1994):
- Brücken in Deutschland. HB Verlagsgesellschaft, Hamburg (Germany), pp. 14-15. (1983):
- Brücken in Deutschland II. für Straßen und Wege. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-46-0, pp. 92-93. (2007):
- Der Stahlüberbau der Moselbrücke bei Dieblich-Winningen. In: Stahlbau, v. 42, n. 7 (July 1973), pp. 211-216. (1973):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 436. (1999):
- About this
data sheet - Structure-ID
20000686 - Published on:
28/04/2000 - Last updated on:
15/08/2023