General Information

Other name(s): Tunnel Mosel
Beginning of works: July 1992
Completion: December 1993
Duration of works: 17 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , , ,
Coordinates: 50° 47' 12.32" N    12° 28' 52.39" E
Coordinates: 50° 47' 9.19" N    12° 29' 13.40" E
Show coordinates on a map

Technical Information

Dimensions

clear interior profile 2 x 13.50 m × 6.32 m
tunnel length 428 m
number of tubes 2
eastern ramp length 122 m
piles diameter 1.30 m
western ramp length 150 m

Quantities

concrete volume 37 168 m³
prestressing steel 123.5 t
reinforcing steel 5 554 t
volume of extracted material 161 650 m³
sheet piling 9 168 m²
water proofing 17 525 m²
volume of earthworks 36 000 m³
piles total length of piles 520 m
ramps concrete volume 11 000 m³
tunnel concrete volume 37 168 m³

Cost

cost of construction German Mark 59 000 000

Materials

tunnel structure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001171
  • Published on:
    15/12/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine