General Information
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Vandières, Meurthe-et-Moselle (54), Grand-Est, France |
---|---|
Part of: | |
Coordinates: | 48° 57' 31.09" N 6° 2' 34.16" E |
Technical Information
Dimensions
length | 182.60 m | |
span lengths | 38.50 m - 2 x 52.00 m - 38.50 m | |
number of spans | 4 | |
deck | width | 18.96 - 25.29 m |
deck slab thickness | 35 cm | |
girder depth | 3.55 m |
Quantities
deck | structural steel | 1 300 t |
concrete volume | 1 500 m³ | |
foundations | concrete volume | 1 800 m³ |
substructure | concrete volume | 3 200 m³ |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Architecture
-
Alain Spielmann Architecte
- Alain Spielmann (architect)
Main contractor
Civil works
Steel construction
Earthworks
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ouvrage de décharge de la Moselle (Meurthe-et-Moselle). In: Bulletin ponts métalliques, n. 24 ( 2007), pp. 168-171. (2007):
- About this
data sheet - Structure-ID
20032115 - Published on:
30/09/2007 - Last updated on:
12/08/2022