General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Mornay-sur-Allier, Cher (18), Centre-Val de Loire, France Langeron, Nièvre (58), Bourgogne-Franche-Comté, France |
---|---|
Crosses: |
|
Carries: |
|
Replaces: |
Mornay-sur-Allier Bridge (1936)
|
Coordinates: | 46° 48' 53.56" N 3° 2' 41.97" E |
Technical Information
Dimensions
width | 10.80 m | |
total length | 280 m | |
number of spans | 5 |
Materials
superstructure |
composite steel-reinforced concrete
|
---|
Participants
Owner
Client
Architecture
- Groupe Renaissance
- Laurent Barbier (architect)
- J. Dolveck (architect)
- J. Mestoudjian (architect)
Construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20003257 - Published on:
15/05/2002 - Last updated on:
21/04/2016