0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: January 2012
Completion: 25 January 2014
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Part of:
Coordinates: 45° 46' 19.74" N    8° 51' 6.41" E
Coordinates: 45° 46' 12.49" N    8° 49' 26.90" E
Show coordinates on a map

Technical Information

Dimensions

eastern tube length 2177 m
western tube length 2177 m

Chronology

4 December 2013

Eastbound tunnel breakthrough

25 January 2015

Opened to traffic

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Fiumara, Claudio (2012): La Galleria Morazzone. In: Strade e Autostrade, v. 16, n. 95 (September 2012), pp. 40-47.
  • Brighenti, Luigi (2015): Primo lotto della A60. In: Strade e Autostrade, v. 19, n. 110 (March 2015), pp. 26-27.
  • About this
    data sheet
  • Structure-ID
    20065810
  • Published on:
    23/11/2013
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine