0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Montpellier Tramway Line 5

General Information

Beginning of works: 2019
Completion: 2025
Status: under construction

Project Type

Function / usage: Tramway line

Location

km Name

Technical Information

Dimensions

length 17.5 km
number of tracks 2
number of stations 27
track gauge 1 435 mm

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086431
  • Published on:
    12/08/2023
  • Last updated on:
    12/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine