0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Montigny-lès-Cormeilles Footbridge

General Information

Completion: 1999
Duration of works: 9 months
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Pedestrian bridge (footbridge)
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Autoroute A15
Coordinates: 48° 59' 32.92" N    2° 11' 16.90" E
Show coordinates on a map

Technical Information

Dimensions

arch span 55 m

Quantities

structural steel 85 t
abutments concrete volume 98 m³
suspenders steel for cable-stays 0.47 t

Cost

cost of construction (incl. taxes) French Franc 7 950 000

Materials

arch steel
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006587
  • Published on:
    07/11/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine