General Information
Name in local language: | Galleria Monte Benedetto; Küchelberg Tunnel |
---|---|
Other name(s): | Küchelberg Tunnel |
Completion: | 2026 |
Status: | in use/under construction |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Merano, Bolzano/Bozen, Trentino-South Tyrol, Italy |
---|---|
Address: | SP185 |
Coordinates: | 46° 40' 11.02" N 11° 8' 20.23" E |
Coordinates: | 46° 40' 32.57" N 11° 8' 46.65" E |
Coordinates: | 46° 40' 33.07" N 11° 10' 19.03" E |
Technical Information
Dimensions
length | 2 790 m |
Chronology
25 October 2013 | First section (935 m) opened to traffic |
---|---|
26 March 2021 | Works started on second section (1 855 m) |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- La Galleria Küchelberg sulla circonvallazione di Merano. In: Strade e Autostrade, v. 26, n. 162 (November 2023), pp. 22-30. (2023):
- About this
data sheet - Structure-ID
20081579 - Published on:
05/09/2021 - Last updated on:
05/09/2021