0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Pont du Mont-Blanc
Beginning of works: 1861
Completion: 1862
Duration of works: 300 days
Status: demolished (1903)

Project Type

Function / usage: Road bridge

Location

Location: , ,
Replaced by: Mont Blanc Bridge (1903)

Technical Information

Dimensions

deck deck width 16.0 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019928
  • Published on:
    11/03/2006
  • Last updated on:
    12/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine