0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1910
Completion: 23 November 1911
Status: in use

Project Type

Location

Location: , , ,
Address: Monroe Street
Crosses:
  • Spokane River
Replaces: Monroe Street Bridge (1890)
Coordinates: 47° 39' 38.12" N    117° 25' 35.93" W
Show coordinates on a map

Technical Information

Dimensions

length 272.18 m
number of lanes 4
roadway / carriageway width 15.24 m
walkway width 2 x 2.74 m
main bridge
span lengths 42 m - 92 m - 42 m
number of spans 3
northern approach viaduct
total length 42.67 m
southern approach viaduct
total length 52.12 m

Quantities

Reconstruction
concrete volume 15 675 m³

Cost

cost of construction United States dollar 535 000
Reconstruction
cost of construction United States dollar 13 300 000

Materials

deck reinforced concrete
piers reinforced concrete
arches reinforced concrete

Participants

Reconstruction (2005)
Design
Contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043442
  • Published on:
    06/02/2009
  • Last updated on:
    13/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine