General Information
Status: | in use |
---|
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Box girder bridge |
Awards and Distinctions
2021 |
Merit Award
for registered users |
---|
Location
Location: |
Tustin, Orange County, California, USA |
---|---|
Address: | Moffett Drive |
Coordinates: | 33° 42' 3.22" N 117° 48' 32.94" W |
Technical Information
Dimensions
number of spans | 1 | |
number of lanes | 2 | |
abutments | number | 2 |
Cost
cost of construction | United States dollar 5 750 000 |
Materials
deck |
prestressed concrete
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Notes
Although the bridge may provide the appearance of a tied arch, the arches are purely decorative from a structural point of view and do not carry any of the bridge's traffic loads.
Participants
Structural engineering
Relevant Web Sites
- About this
data sheet - Structure-ID
20088636 - Published on:
01/06/2024 - Last updated on:
01/06/2024