General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge |
Construction method: |
deck: Precast girders with cast-in-situ slab |
Location
Location: |
Modi'in-Maccabim-Re'ut, Central District, Israel |
---|
Technical Information
Dimensions
total length | 230 m | |
span lengths | 30 m - 170 m - 30 m | |
number of spans | 3 | |
arch | arch span | 90 m |
Cost
cost of construction | ca. 29 000 000 |
Materials
arch |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
girders |
precast prestressed concrete
|
Notes
The deck is made up of 9 spans of prefabricated, pre-tensioned inverted double-T sections – the beams are put alongside each other – and made continuous with a cast-in place deck slab. The typical deck span is 18 meters.
The foundations are cast-in-place spread footings.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20044804 - Published on:
08/04/2009 - Last updated on:
05/02/2016