General Information
Other name(s): | Regua Viaduct |
---|---|
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Viseu, Portugal Peso da Regua, Vila Real, Portugal |
---|---|
Crosses: |
|
Coordinates: | 41° 9' 12.32" N 7° 46' 38.24" W |
Technical Information
Dimensions
total length | 900.00 m | |
span lengths | 32.00 m - 4 x 50.00 m - 60.00 m - 80.00 m - 100.00 m - 140.00 m - 180.00 m - 108.00 m | |
number of spans | 11 | |
deck | deck width | 25.70 m |
height above valley floor or water | 94 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Designing bridges - A quest for beauty. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 35-50. (2004):
- About this
data sheet - Structure-ID
20012532 - Published on:
26/07/2004 - Last updated on:
09/11/2024