0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Metzdorf-Moesdorf Footbridge

General Information

Beginning of works: April 1986
Completion: 1987
Status: demolished (2018)

Project Type

Location

Location: , , , , ,
, , ,
Crosses:
  • Sûre (Sauer)
Replaced by: Metzdorf-Moesdorf Footbridge (2018)
Coordinates: 49° 44' 50.65" N    6° 30' 4.63" E
Show coordinates on a map

Technical Information

Dimensions

total length 70.00 m
pylon pylon height 15 m

Materials

deck Ekki-Azobe wood
pylons Ekki-Azobe wood

Chronology

11 June 1984

Groundbreaking ceremony.

April 1986

Construction begins.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20005301
  • Published on:
    22/09/2002
  • Last updated on:
    05/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine