General Information
Completion: | 6 March 2015 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 39.75 km | |
number of stations | 33 | |
track gauge | 1 000 mm |
Excerpt from Wikipedia
Line 2 of Metrovalencia opened on March 6, 2015 in the city of Valencia, Spain. The line, which featured no new stations, was created as part of a restructuring of public transport in the city. It replaced the branch of Line 1 which ran from Llíria to Torrent.
History
The original line 2 of Metrovalencia was opened with the rest of the network in 1988 and ran from Llíria to Villanueva de Castellón. On 16 September 1999, line 2 ceased to exist when it was merged into line 1.
In the 2000s, a new line 2 was planned, to run from Tavernes Blanques to Valencia's Natzaret district. After years of delays, it opened in May 2022 as line 10. The line 2 designation is now used for existing branches of the network. The frequency of trains on these branches will remain unchanged.
Text imported from Wikipedia article "Line 2 (Metrovalencia)" and modified on December 11, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20089968 - Published on:
10/12/2024 - Last updated on:
16/12/2024