General Information
Official designation: | BW 154 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rumbeck, Arnsberg, Hochsauerlandkreis, North Rhine-Westphalia, Germany |
---|---|
Address: | Mescheder Straße |
Carries: |
|
Part of: | |
Coordinates: | 51° 23' 28.12" N 8° 6' 38.20" E |
Technical Information
Dimensions
total length | 141.00 m | |
span lengths | 31.5 m - 38.0 m - 38.0 m - 31.5 m | |
number of spans | 4 | |
bridge surface | 4 270 m² | |
deck | deck width | 15.40 m + 14.90 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Prestressing
Relevant Web Sites
- About this
data sheet - Structure-ID
20007168 - Published on:
09/12/2002 - Last updated on:
29/04/2021