0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Maishuia First Bridge; MacArthur First Bridge
Completion: 1964
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Keelung River
Near: Mei-Shywe Second Bridge (1996)
Coordinates: 25° 3' 8.01" N    121° 34' 20.75" E
Show coordinates on a map

Technical Information

Materials

piers reinforced concrete
arch steel
Vierendeel truss steel

Chronology

2000

Lower deck added.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20028501
  • Published on:
    13/06/2007
  • Last updated on:
    31/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine