General Information
Completion: | 1 February 1991 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Narayanganj, Narayanganj, Dhaka, Bangladesh |
---|---|
Coordinates: | 23° 36' 21.53" N 90° 36' 50.59" E |
Technical Information
Dimensions
main span | 87 m | |
total length | 930 m |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Structural engineering
Relevant Web Sites
Relevant Publications
- バングラデシュ・メグナ橋の建設 (Meghna Bridge Construction in Bangladesh). In: Concrete Journal (JCI), v. 29, n. 6 ( 1991), pp. 46-55. (1991):
- About this
data sheet - Structure-ID
20004939 - Published on:
14/09/2002 - Last updated on:
05/01/2017