General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Location
Location: |
Napa, Napa County, California, USA |
---|---|
Crosses: |
|
To replace: |
Maxwell Bridge (1949)
|
Coordinates: | 38° 16' 53.66" N 122° 17' 4.98" W |
Technical Information
Dimensions
total length | 518 m | |
number of lanes | 4 |
Cost
cost of construction | United States dollar 40 000 000 |
Materials
deck |
precast prestressed concrete
|
---|
Chronology
3 December 2003 | Part of the wooden falsework collapses on itself during construction. One worker is killed. |
---|
Participants
Architecture
Structural engineering
Contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20010930 - Published on:
07/12/2003 - Last updated on:
05/02/2016