General Information
Completion: | 7 November 1987 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Metro or rapid transit system |
---|
Location
km | Name |
Technical Information
Dimensions
number of tracks | 2 | |
number of stations | 134 | |
system length | 231 km | |
track gauge | 1 435 mm |
Design Loads
design speed | 90 - 100 km/h |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Le métro de Singapour (lot n°106). In: Travaux, n. 615 (November 1986), pp. 1-6. (1986):
- Le métro de Singapour - Lot 302. Presented at: La Technique Française du Béton, XIe Congrès de la FIP Hambourg 1990, pp. 333-344. (1990):
- La North-East line du métro de Singapour. Les travaux spéciaux du contrat 705. In: Travaux, n. 753 (May 1999), pp. 66-69. (1999):
- Singapore Mass Rapid Transit System: Construction. In: Proceedings of the Institution of Civil Engineers, v. 86, n. 4 (August 1989), pp. 709-770. (1989):
- Singapore Mass Rapid Transit System: Design. In: Proceedings of the Institution of Civil Engineers, v. 86, n. 4 (August 1989), pp. 667-707. (1989):
- About this
data sheet - Structure-ID
20086811 - Published on:
09/09/2023 - Last updated on:
03/05/2024